It only took 8 students, but we put the cab on by hand this morning. We got a little bit of time to throw in the parking brake/transfer case shifter mount along with the clutch master, remote cylinder and slave too. Here is how the thing looks now:
I measured the floor of the cab to the ground today and got 35 inches. I have written Sermis an email telling him to work on his verticle jump because he is going to need it.